Start this sheet when: Haematemesis, coffee-ground vomit or melaena, or fresh rectal bleeding with shock. Anyone with known liver disease or alcohol use: treat as variceal until endoscopy says otherwise.
Time since door
--
1.Triage, shock index checked (HR / SBP)
≤ 5 min from door · ED KPI: triage median 5 min
2.Two large-bore cannulas, group and crossmatch sent
≤ 15 min from door · Local target: in the first 15 min
3.Glasgow-Blatchford score documented
≤ 1 h from door · NICE CG141: score at first assessment
4.Transfusion started (Hb below 7, or 8 with heart disease, or shock)(Needs blood)
≤ 30 min from door · Local target: MTP if still shocked
5.Terlipressin (or octreotide) given(Suspected variceal bleed)
≤ 30 min from door · Baveno VII: as soon as varices suspected
6.Ceftriaxone 1 g given(Cirrhosis)
≤ 1 h from door · Baveno VII: antibiotic prophylaxis in cirrhosis
7.Endoscopy done (variceal or unstable after resus)(Variceal or high-risk)
≤ 12 h from door · Baveno VII / ESGE 2021: within 12 h
8.Endoscopy done (stable, non-variceal)(Stable, admitted)
≤ 24 h from door · NICE CG141 / ESGE 2021: within 24 h
9.Disposition decided
Record · Admit / transfer / OT; for the length-of-stay audit
10.Patient left the ED
≤ 2 h from disposition decision · ED KPI: decision to departure 2 h or less
Targets marked “local” are suggestions: agree your own with the quality committee before auditing against them.