Start this sheet when: Convulsive seizure lasting 5 min or more, or two or more seizures without full recovery in between. Onset unknown: enter the arrival time as onset. Pregnant over 20 weeks or just delivered: treat as eclampsia (magnesium) until proven otherwise.
Time since door
--
1.Airway, oxygen, bedside glucose checked
≤ 5 min from door · Local target: with the first benzodiazepine
2.First benzodiazepine, full dose
≤ 5 min from door · AES 2016: from minute 5; no IV = IM / buccal midazolam
3.Second benzodiazepine dose(Still seizing)
≤ 10 min from first benzodiazepine · NICE NG217: repeat once after 5-10 min
4.Second-line drug running(Benzo failed)
≤ 40 min from seizure onset · AES 2016: levetiracetam, valproate or fosphenytoin
5.RSI and anaesthetic infusion started(Still seizing)
≤ 1 h from seizure onset · AES 2016: third phase 40-60 min
6.Seizure clinically stopped
≤ 1 h from seizure onset · NCS 2012: definitive control within 60 min
7.CT head done(First fit, trauma, focal)
≤ 1 h from door · Local target: once seizure is controlled
8.Neurology / EEG arranged(Not waking up)
≤ 1 h from seizure end · NCS 2012: EEG if not back to baseline
9.Disposition decided
Record · Admit / transfer / OT; for the length-of-stay audit
10.Patient left the ED
≤ 2 h from disposition decision · ED KPI: decision to departure 2 h or less
Targets marked “local” are suggestions: agree your own with the quality committee before auditing against them.