Start this sheet when: Suspected infection with NEWS2 5 or more, any single red-flag sign (SBP 90 or less, new confusion, RR 25 or more, SpO2 below 92%, mottled skin), or lactate 2 or more. Time zero is the door, or the moment sepsis is recognised if that is later.
Time since door
--
1.Triage, sepsis screen positive
≤ 5 min from door · ED KPI: triage median 5 min
2.Doctor review at the bedside
≤ 15 min from door · Local target: red-flag sepsis seen at once
3.Lactate measured (venous gas is fine)
≤ 1 h from door · SSC hour-1 bundle
4.Blood cultures x2 drawn
≤ 1 h from door · SSC hour-1: before the antibiotic, never delaying it
5.First antibiotic dose running
≤ 1 h from door · SSC 2021: 1 h in shock or probable sepsis
6.30 mL/kg balanced crystalloid completed(Hypotension or lactate 4+)
≤ 3 h from door · SSC 2021: first 3 h
7.Noradrenaline started for MAP below 65(MAP below 65 despite fluids)
≤ 1 h from door · SSC hour-1 bundle: during or after fluids
8.Repeat lactate(First lactate 2 or more)
≤ 4 h from door · SSC 2021: repeat at 2-4 h if first was raised
9.Disposition decided
Record · Admit / transfer / OT; for the length-of-stay audit
10.Patient left the ED
≤ 2 h from disposition decision · ED KPI: decision to departure 2 h or less
Targets marked “local” are suggestions: agree your own with the quality committee before auditing against them.