Start this sheet when: Pregnant with a trauma-team call, or any abdominal blow, fall or road accident from 20 weeks (fundus at or above the umbilicus), even if she looks well. Save the mother first.
Time since door
--
Write who holds each role and stamp when they arrive. In a small ED one person may hold two roles; write the name in both.
Team leader · senior ED doctor
Directs from the foot end; makes the calls
Airway · anaesthetist
Airway, C-spine hold, RSI, ventilation
Procedures · surgeon / 2nd doctor
Chest, eFAST, drains, binder, bleeding control
Circulation nurse · staff nurse 1
IV/IO x2, bloods, blood products, TXA, drugs
Monitor & scribe · staff nurse 2
Vitals every 5 min; times on this sheet
Runner · MPW / attendant
Blood bank, samples, CT, porter, family
Obstetrician · obstetrics
Uterus, CTG, abruption, perimortem kit
Neonatal · paediatrician
Newborn resus if 24 wk+ and delivery likely
1.Trauma leader at bedside, obstetrician called
≤ 5 min from door · Local target: both teams on one call
2.Left uterine displacement / 15-30° tilt(20 weeks+)
≤ 5 min from door · ATLS 11e: at once from 20 weeks
3.Primary survey and eFAST completed
≤ 15 min from door · Local target (ATLS sequence)
4.First blood product running (MTP)(Shocked)
≤ 15 min from door · Local target: O-negative in shock
5.Tranexamic acid 1 g given(Bleeding)
≤ 3 h from time of injury · CRASH-2: within 3 h of injury
6.Continuous CTG started(24 weeks+)
≤ 30 min from door · Local target; run at least 4 h (ATLS 11e)
7.Maternal cardiac arrest(Arrest)
Record · Record only: starts the delivery clock
8.Perimortem delivery started(Arrest, 20 weeks+)
≤ 4 min from maternal arrest · RCOG GTG 56: start by 4 min, baby out by 5
9.Kleihauer sent and anti-D given(Rh-negative)
≤ 72 h from time of injury · BCSH 2014: within 72 h of the event
10.MLC registered, police intimated
Record · Never delay care for police (Parmanand Katara)
11.Disposition decided
Record · Admit / transfer / OT; for the length-of-stay audit
12.Patient left the ED
≤ 2 h from disposition decision · ED KPI: decision to departure 2 h or less
Targets marked “local” are suggestions: agree your own with the quality committee before auditing against them.